Electrical
Service work and install work, without juggling tools.
One system for the troubleshooting visit, the panel upgrade quote, and the EV install — including the permit paperwork.
Panel upgrade quotes
Photo of the existing panel and the AI suggests a 200A / 400A spec, surge protector, and grounding work.
EV charger installs
Pre-built quote templates for Level 2 installs with the rebate amount auto-filled by zip code.
Permits & inspections
Town-by-town permit checklists. Mark the rough-in passed and the final inspection auto-schedules.
Material take-offs
Wire, conduit, and box counts pulled from the scope so the truck stocks before the crew rolls.
Generator follow-ups
After install, TradeOS auto-creates the annual maintenance contract and reminds the customer.
Solar + battery ready
Quote line items support net-metering credits, battery interconnect, and utility paperwork.
Compliance without the spreadsheet.
Electrical work lives or dies on documentation: permits, inspection dates, license numbers, AHJ contacts. TradeOS keeps it attached to the job so the office isn't chasing paper a week after the install. When inspectors ask for the 30-day follow-up, you have it.